As of June 1, Vryhof will no longer support the Internet Explorer 11 browser. For the best experience, please switch to a modern browser

Cases

Permanent support for pipeline integrity

Delmar Systems was awarded the engineering, procurement, and construction (EPC) contract for the detailed design and fabrication of five (5) subsea suction pile foundations in the Gulf of Mexico to support an..

LLOG – WHO DAT

Delmar Systems has completed subsea tree installations using the patented Heave Compensated Landing System (HCLS) for multiple LLOG Who Dat drill centers. Delmar Systems' experience with a variety of water depths and..

SHELL APPOMATTOX PERMANENT FACILITY

Delmar provided mooring design engineering services for Shell’s Appomattox permanent facility in the Gulf of Mexico. This included global mooring analysis verification using Delmar’s non- linear polyester stiffness methodology and in-house mooring..

ANADARKO RED HAWK

Anadarko elected to decommission the Red Hawk cell spar production platform. The potential future sale and relocation of the platform required the abandonment of the existing steel catenary risers from their hang..

LLOG OPTI-EX WHO DAT

Delmar Systems was awarded the engineering, procurement, construction, and installation (EPCI) contract for the mooring and installation of the OPTI-EX floating production facility, which was installed in the Mississippi Canyon area of..